KKELLWOODLIGHTING Tel 01387 255 816Edit seriesOffice

Lighting case study · Industrial

Aircraft Hangar

Loganair Hangar

≥70%Forecast energy

Overview

The maintenance hangar, operated by Loganair at Glasgow Airport, had outdated and inadequate lighting. Kellwood Lighting was briefed to supply a technically demanding six-fold increase in light levels, while delivering a reliable and efficient solution.

A further challenge was provided by a need to absolutely minimise disruption due to a tightly packed, time sensitive maintenance schedule, making a turnkey solution provided by a single company essential.

Kellwood’s Lighting and Electrical divisions worked closely together to put forward the chosen solution. Multiple designs were modelled, analysed and iterated to ensure an optimised design from both lighting and installation perspectives.

Lighting Design

Due to the huge increase in lux levels, a major concern was how to find the most cost effective method of meeting the light level targets without increasing glare. The standard method of achieving this would be to increase the number of lights, however installing new mounting points would have necessitated exceeding the tight installation window and exceeded the desired budget.

Kellwood’s solution was to mount our high efficiency, low glare Haldane Series in pairs, together with an advanced multi-step dimming, daylight harvesting occupancy controlled sensor, mounted on a customised bracket system. This allowed the necessary increase in units without expensive alterations to the wiring infrastructure.

The daylight harvesting and occupancy control allows the new solution to meet the lighting targets while consuming less power than the previous solution

The work

Detailed planning and close communication were essential to identify and mitigate potential problems and streamline the installation plan according to allocated timeslots in each maintenance zone.

The lights and sensors were assembled onto the bespoke bracketry in house and delivered on custom made pallets to ensure the whole process was both simple and rapid. This all made for an extremely efficient and cost effective installation on site, ensuring the project was delivered to the time-scales requested by our client.

The results

Kellwood’s solution was to mount our high efficiency, low glare Haldane Series in pairs, together with an advanced multi-step dimming, daylight harvesting occupancy controlled sensor, mounted on a customised bracket system. This allowed the necessary increase in units without expensive alterations to the wiring infrastructure.

BeforeAfter
Average Light Level193 lux1100 lux
ControlsNonePhotocell, PIR

“I’d like to offer my sincere appreciation and admiration for a project that was well planned and promptly accomplished.”

Eamon McHugh Head of Base Maintenance

VIEW PRODUCTS

More industrial case studies

All case studies

LATEST BLOG POSTS


The Best Place to Install LED Drivers in Outdoor Sports Lighting ProjectsSports Lighting · Michael Boyom · 28th April, 2026Should You Choose an ISO9001 Lighting Supplier?Business News · Adam Maitland · 18th April, 2026Red-White LED Lighting for FETF 300 GrantsIndustrial Lighting · Adam Maitland · 24th March, 2026

All blog posts

Our lights are used by

I am delighted to have used Kellwood...
P. Nisbet, Wabtec Corporation
a project that was well planned and promptly accomplished
E. McHugh, Loganair
Where others let us down, Kellwood did not
W. Coley, Barking Abbey School
...my client is over the moon with the end results
A. Fraser, MacLean Electrical
I'd certainly recommend them
V. Richardson, Stolle Europe
I'm more than pleased with the guys. I'd recommend them to anyone
G. Gray, Logoplaste